Enlarge a window that is already there
Cut the opening taller or wider in block or poured wall, set a new egress-size window, build the well with a drain and a cover, trim inside. Permit and utility locate included.
Egress windows · Wells · Basement bedrooms
We cut egress windows, build the wells and finish the room around them. The size comes from the code and the permit. The rest comes from your house.

The egress window, explained
A bedroom downstairs needs the same few numbers in every house. This is where the inspector puts the tape.

At least 5.7 square feet with the sash open, 24 inches tall and 20 inches wide at the least. The height, the width and the area all have to pass.
No more than 44 inches from the finished floor to the bottom of the opening. A higher sill needs a built-in step.
A well at least 9 square feet and 36 inches each way, with a ladder if it is deeper than 44 inches, a drain and a cover that opens from inside.
Most of the room needs 7 feet finished. Beams and ducts may hang lower in places; the inspector reads the exact limit.
These are the figures we work to; your town's inspector has the last word, and we check at the permit counter before we quote.
The jobs we price most
Four jobs, each with what it covers.
Cut the opening taller or wider in block or poured wall, set a new egress-size window, build the well with a drain and a cover, trim inside. Permit and utility locate included.
A new header over a new opening, the window, the well, the drain and the cover, framing and trim inside. Permit and utility locate included.
For a sill that sits low in the ground: a taller well, built-in ladder rungs and a larger drain pocket.
A door opening cut in the wall, poured steps and retaining walls, a drain at the bottom. Doors and railings are quoted on their own line.
Rock, a gas, water or sewer line in the way, and a second window each change the number. Your written quote lists every line.
The window job
A usual job runs three to five working days. Wet ground or a surprise in the wall can add days, and we say so the same afternoon.
We measure inside and out, mark the opening in chalk, call 811 for the utility locate and file the permit.
Hand-dig near the lines, machine-dig where there's room. Dust sheeting goes up inside and the stairs are covered.
A wet saw makes the opening so the dust stays down. A header goes in over it and the buck is framed.
The window is set, flashed and sealed. The well goes against the wall on gravel and the drain is tied in.
Inside trim, backfill, grade away from the wall. The inspector comes while the opening is still open to see.
Around the window
Framing, insulation, drywall, a door and a closet, smoke and carbon monoxide alarms, and heat that reaches the room.
Bedroom conversionsA rough-in at the right depth, a floor drain or an ejector pit, a vented fan and tile you can wash.
Basement bathsA stairwell and a door where the wall meets the yard, then a room that opens to it.
Walk-out stairwellsBefore the saw
The window is drawn on your wall before you sign. That's the whole quote: what you see in chalk is what gets cut.
Wisconsin's dwelling code covers the structure, and your town's inspector covers the rest. We measure, we pull the permit and we book the inspection. If an inspector reads a number differently than we did, we change the opening, not the story.
Chalk outline on your wall at the visit
Utility locate called in before anyone digs
Permit filed under our name, with your address
Inspector scheduled while the opening is still open

From homeowners
“Gaoly drew the window on our wall in chalk before we signed. The inspector measured exactly what she had shown us.”
“They dug the well by hand beside the gas meter and left the lawn flat. The drain was tied in before the stone went in.”
“The quote listed the window, the well, the drain and the permit as separate lines. Nothing showed up on the bill that wasn't on the page.”
Sample reviews.
Where we work
Type your ZIP to see if we come to you.
We don't take jobs north of Mequon, west of Waukesha or in Racine and Kenosha counties. We don't build new houses, roofs or decks.
Before you call
The usual reading is 5.7 square feet of clear opening with the sash open, at least 24 inches tall and 20 inches wide, with the bottom of the opening no more than 44 inches off the floor. Both the height and the width have to be met, not just the area. Your inspector's reading rules, and we confirm it at the permit counter.
Ours do. Each well sits on gravel with a drain tied to the footing drain or to a pit below it, so it doesn't fill like a bucket. The cover has to open from inside without a key.
An egress opening changes the structure, and Milwaukee and the towns around it ask for a permit. We file it, mark the utilities and meet the inspector. Where a town wants the owner's signature, we send you the form.
Federal rules ask for lead-safe work practices when paint is disturbed in a home built before 1978. Windows and demolition are always covered; small repairs under 6 square feet inside or 20 outside are not. We tell you before work starts and leave you the EPA pamphlet. The firm's certificate is on the credentials page.
A list of lines: the window, the well, the drain, the cover, inside trim, the permit and haul-off, with what is not in the price, such as rock, a sewer or gas line in the way, and paint beyond the patch.
Get a quote
Send a photo of the wall and window by text, or fill in the form. We call back to set a time to measure.