When you call
What happens after you reach out
- Day 0
Step 1: You send a photo or call
A text with a photo of the wall from inside and out is enough to start.
- This week
Step 2: We visit and measure
Gaoly or Mesfin comes, measures the wall and the ground outside, and chalks the opening.
- After the visit
Step 3: You get a written quote
Every line has a name: window, well, drain, cover, trim, permit. What's not in the price is listed too.
- Before the dig
Step 4: We pull the permit
We file it, call 811 and set the dig date.
- Job days
Step 5: The crew cuts and sets
Three to five days for a window, longer for a stairwell.
- Last day
Step 6: The inspector visits
While the opening is still open. You get a copy of the sign-off.
The calendar
When each part of the work happens
Plan and permit
Measure, quote and file while the ground is frozen.
Dec to Mar
Dig and cut
Wells, windows and stairwells go in once the frost is out.
Apr to Nov
Rooms inside
Bedrooms and baths don't wait for the weather.
all year
Who does what
What we do and what you do
| You do | We do | |
|---|---|---|
| Measure | You doClear the wall and tell us where the lines enter | We doMeasure the wall and chalk the opening |
| Permit | You doSign where the town asks the owner to | We doFile the permit and book the inspector |
| Dig day | You doMove cars and clear the stairs | We doLocate, dig and cut |
| Inspection | You doKeep the room open for the visit | We doBe there when the inspector comes |
Start with a photo
Text the wall from inside and out. We call back with what we'd measure.