Skip to content
Digging slows when the ground freezes. Ask what we can book this month.
Monday – Friday: 7:00 a.m. – 4:30 p.m.Dwelling Contractor · WI Credential no. 000000(414) 555-0101

What moves the price

Five things set the number

  • The wall

    • Block, poured or stone

    • How thick the wall is

    • How high the sill sits

  • The ground outside

    • Depth of the well

    • Clay, fill or rock

    • How far a machine can reach

  • What's in the way

    • Gas, water, sewer or electric lines

    • Trees, steps and decks

  • How many openings

    • One window or two

    • A well each, or a shared one

  • What's around it

    • A finished room or a bare wall

    • A bath or a laundry nearby

A sample written quote

What the paper looks like

Every quote lists its lines, each with its own price. This sample shows the lines of one job.

  • Sample quote: one egress window and well

    A new opening in a block wall, with a deep well and a ladder.

    • Wet-cut the opening and haul out the block
    • Header over the opening
    • Egress casement window, flashed and sealed
    • Well, 42 inches deep, with a ladder and a cover
    • Drain tied to the footing drain
    • Inside framing and trim
    • Permit and utility locate

    Not in the quote: rock, a moved gas or water line, paint beyond the patch.

Your quote lists your own lines and prices.

Common jobs

The jobs we price most

Openings and wells

  • Enlarge an existing window

    Opening, header, window, well, drain, cover, trim.

  • A new opening

    The same, with a new header over a new opening.

  • A deeper well, with a ladder

    For a sill low in the ground.

  • A walk-out stairwell

    Door opening, steps, retaining walls, drain. Door and railing separate.

Rooms

  • A basement bedroom, about 12 by 12

    Framing, insulation, drywall, floor, door, closet, alarms. The egress window is its own line.

  • A half bath

    Slab cut, drain and vent, framing, fan, drywall. Fixtures separate.

Your written quote lists every line and what is not in it.

Paying

Deposits and payments

The deposit and the schedule are in your contract, and follow Wisconsin's home improvement rules.

  • Deposit

    A deposit holds the dig date and pays for the permit. The amount is in the contract.

  • Payments

    Payments follow the work: after the cut, after the window and well, and after the inspection.

  • Changes

    A change is written, priced and signed before we do it.

  • What's left out

    Rock, a moved line and paint are not in the price until you see them on a line.

Why no average

We don't print an average

Cost guides disagree on egress windows by a factor of several, because a wall, a well and a yard are different in every house. An average would be wrong for yours.

That's why the quote comes after we measure. Yours is on paper.

Get a number for your wall

We measure, then write the quote.